![](https://www.paganetti.net/wp-content/uploads/2020/01/centrale-de-traitement-dair-17000-m3h-et-groupe-deau-glace.jpg)
01 Jan TOTAL
Posted at 14:08h in Projects
- Preventive maintenance on laboraty ventilation and air conditioning : water chiller 80 kW and air flow CTA 17 000 m³/h.
- Oil boiler and burner 620 kW to heat the air handler network, radiators and hot water.
- Maintenance on refrigerated display case, cooling cell and cold room.