ARIANE GROUP – CLEAN ROOM AIR CONDITIONING

ARIANE GROUP – CLEAN ROOM AIR CONDITIONING

Dismantling of :

  • Air handling unit and his conditioning unit (including refrigerant recovery),
  • Electric control panel and power supply cables,

Supply and installation of :

  • One air conditioning cabinet 5 kW cooling capacity,
  • Associated refrigeration links and  ventilation ducts,
  • Electrical connection.

Qualification test of the clean room.

Share on